kitchen is progressing.
70% of electrical is done
Ceiling insulation is done
All lights brackets are done
That's 3 dones and I think that makes a right.
Right?
Hopefully this weekend all electrical is done
and ceiling drywall is put up
that is alot of work. I hope I am not too dead after my 18 mile run on Saturday.
On another note, the remaining kitchen cabinets are ordered and may be here this weekend. I ordered the kitchen sink today.
Here's a pix of the island brackets and insulated ceiling.
No comments:
Post a Comment